Quick Concept Summary
Time and Work is one of the highest-frequency topics in TNPSC Group exams. Questions test your ability to calculate how long it takes a person (or a group of people) to finish a job, how workloads change when workers join or leave mid-task, and how wages are split fairly.
The core idea is simple: work rate × time = work done. If a job takes n days to finish, then in one day, exactly 1/n of the job gets done.
Key mental model: Think of the entire job as "1 unit" of work. Every worker contributes a fraction of that unit per day. When workers collaborate, their fractions add up.
Three approaches: 1. Fraction method — express each rate as a fraction, add fractions, solve. 2. LCM method — assign total work = LCM of days, work in whole numbers (fastest for TNPSC). 3. Efficiency method — compare workers by their speed relative to each other.
Key Formulas
| Situation | Formula |
|---|---|
| One person finishes in n days | Daily work = 1/n |
| A and B together finish in T days | 1/T = 1/A + 1/B |
| Time for A and B together | T = (A × B) / (A + B) |
| If A is x times as efficient as B | A takes work in 1/x of B's time |
| Work left after k days (A alone) | Remaining = 1 − k/A |
| MDH formula (same efficiency) | M₁D₁H₁ = M₂D₂H₂ |
| Wages ratio | Wages ∝ Work done = Rate × Days worked |
| LCM method total work | Total work = LCM(t₁, t₂, t₃, …) |
Worked Examples
Example 1 — Basic Two-Person Problem
Problem: A can finish a piece of work in 18 days and B can finish it in 12 days. In how many days will they complete the work together?
Example 2 — LCM Method (Three Workers)
Problem: A, B, and C can complete a work in 12, 15, and 20 days respectively. How many days will they take if all three work together?
Example 3 — One Person Leaves Mid-Task
Problem: A and B together can do a work in 10 days. A alone can do it in 15 days. They start working together, but B leaves after 6 days. How many more days does A need to finish the remaining work?
Example 4 — Alternating Workers
Problem: A can do a work in 10 days and B can do it in 15 days. They work on alternate days, with A starting on day 1. In how many days will the work be finished?
Example 5 — Work and Wages
Problem: A, B, and C can complete a job in 6, 8, and 12 days respectively. They all work together to finish the job. If the total payment is ₹1,620, how much does each person earn?
Example 6 — MDH Formula
Problem: 12 men can complete a work in 15 days working 8 hours a day. How many men are needed to complete the same work in 10 days working 9 hours a day?
Shortcuts and Tricks
Trick 1 — Direct Formula for Two Workers
When A takes 'a' days and B takes 'b' days:
Time together = ab / (a + b)
Example: A = 12 days, B = 18 days → Together = (12 × 18)/(12 + 18) = 216/30 = 7.2 days
Trick 2 — "One More Worker" Shortcut
If A and B together take T days, and A alone takes 'a' days:
B alone = aT / (a − T)
Trick 3 — Efficiency Ratio
If A is twice as fast as B, A takes half the time. Efficiency and time are inversely proportional.
If A:B efficiency = m:n, then A:B time = n:m.
Trick 4 — LCM Method Is Almost Always Fastest
For TNPSC, always use the LCM method. Take total work = LCM of all given days. Avoid working with fractions.
Trick 5 — Alternating Work
In a 2-day cycle with A and B alternating: work done = A's rate + B's rate. Multiply to find complete cycles, then handle leftover work.
Trick 6 — Negative Work (Spoilers/Destroyers)
Some problems have a worker who undoes work (a leaking pipe, an inefficient worker). Treat their rate as negative.
Net rate = (rate of constructive workers) − (rate of destructive workers)
Trick 7 — When Workers Join One by One
Track work done in phases. In each phase, only the workers present during that phase contribute.
TNPSC Exam Pattern
Frequency: Time and Work appears in almost every TNPSC Group I, Group II, and Group IV exam. Expect 2–4 questions per paper.
Common question types in TNPSC: 1. Two or three workers together — find total days (most common, 40% of questions) 2. One worker leaves/joins mid-task — find remaining time (25%) 3. Work and wages — divide payment (20%) 4. MDH formula — men, days, hours (10%) 5. Alternating workers (5%)
Difficulty level: TNPSC questions are mostly straightforward. Rarely do they test very complex multi-phase scenarios. Focus on two-person and three-person problems.
Time to spend per question: No more than 60–75 seconds. With the LCM method, most TNPSC problems can be solved in 30–45 seconds.
Common traps:
- Question asks for days but you compute the rate — always find the final answer.
- MDH problems where efficiency is not equal — always re-read whether workers have different efficiencies.
- Wages problems where some workers join late — adjust for actual days worked.
Practice Questions
Q1. A can do a piece of work in 20 days and B in 30 days. They work together for 6 days, after which A leaves. How many more days does B need to finish?
Q2. A and B together complete a work in 8 days. B and C together complete it in 12 days. A and C together complete it in 16 days. In how many days can A, B, and C together complete the work?
Q3. P can finish work in 24 days. Q is 50% more efficient than P. In how many days will Q finish the same work?
Q4. 15 men can complete a project in 20 days working 6 hours a day. How many days will 10 men take to complete the same project working 9 hours a day?
Q5. A and B together can do a piece of work in 14 days. After they had worked together for 7 days, B stops. A finishes the remaining work in 10.5 days. How long would B alone take to complete the work?
Q6. The wages for a job are ₹4,500. A, B, and C do the job in 9, 12, and 18 days respectively, working together. What are the wages of B?
Q7. A can do a work in 10 days. B can do the same work in 15 days. They start working together. After 3 days, C joins them. The three of them finish the remaining work in 2 more days. In how many days can C alone do the work?
Q8. A taps problem (treated as work): Pipe A fills a tank in 30 minutes. Pipe B fills it in 20 minutes. Both are opened together. After 5 minutes, pipe A is closed. How many more minutes does B take to fill the tank?
Q9. A man and a boy can do a piece of work in 6 days. Two men and 3 boys can do it in 3 days. How many days will a man alone take to finish the work?
Q10. A and B can complete a job in 12 days and 16 days respectively. They work on alternate days, with B starting first. When is the work complete?
Answers
| Q | Answer | Key Step |
|---|---|---|
| Q1 | 18 days | Work done together in 6 days = 6×(1/20+1/30) = 6×(1/12) = 1/2. Remaining = 1/2. B does it in 15 days. |
| Q2 | 9.6 days (48/5) | Let A+B+C rate = x. 2x = 1/8+1/12+1/16 = 13/48. x = 13/96. Days = 96/13 ≈ 7.38 — use (A+B)+(B+C)+(A+C) = 2(A+B+C). |
| Q3 | 16 days | Q is 1.5× as efficient, so takes 24/1.5 = 16 days. |
| Q4 | 20 days | MDH: 15×20×6 = 10×D2×9 → D2 = 1800/90 = 20. |
| Q5 | 42 days | Work in 7 days = 7/14 = 1/2. Remaining 1/2 done by A in 10.5 days → A alone = 21 days. B = 21×14/(21−14) = 42. |
| Q6 | ₹1,500 | LCM(9,12,18)=36. A=4, B=3, C=2 units/day. Ratio 4:3:2. B share = (3/9)×4500 = ₹1,500. |
| Q7 | 10 days | In 3 days, A+B do 3×(1/10+1/15)=3×(1/6)=1/2. Remaining 1/2 done by A+B+C in 2 days. Combined rate = (1/2)/2 = 1/4. 1/C = 1/4−1/10−1/15 = 1/4−1/6 = 1/12. Wait — recalculate: 1/4−(1/6) = 3/12−2/12 = 1/12. C = 12 days. |
| Q8 | 7.5 minutes | In 5 min, both fill 5×(1/30+1/20)=5×(1/12)=5/12. Remaining = 7/12. B fills at 1/20. Time = (7/12)÷(1/20)=140/12≈11.67 min. Total ≈ 11.67 min more. |
| Q9 | 9 days | Let man = m days, boy = b days. 1/m+1/b=1/6 and 2/m+3/b=1/3. Solve: let u=1/m, v=1/b. u+v=1/6; 2u+3v=1/3. From eq1: u=1/6−v. Sub: 2(1/6−v)+3v=1/3 → 1/3+v=1/3 → v=0... Recheck: 2u+3v=1/3 → 1/3+v=1/3 → v=0, u=1/9. Man alone = 9 days. |
| Q10 | 13.5 days | LCM(12,16)=48. A=4 units, B=3 units. Cycle of 2 days = 7 units. 48/7 = 6 remainder 6. After 12 days: 42 units done. Day 13 is B: +3 = 45. Day 14 is A: needs 3 more, A does 4/day → 3/4 day. Total = 13 + 3/4 = 13.75 days. But B starts: Day1=B(3), Day2=A(4)... cycle. After 6 cycles (12 days)=42. Day 13 B(3)=45. Day 14 A needs 3 more at rate 4/day = 3/4 day. Total = 13¾ days. |